mirror of
https://github.com/Darkrock-Studios/hammer-editor.git
synced 2026-08-05 23:59:46 +00:00
On app open, sync made ~4 HTTP round-trips per project even when nothing
had changed. Add a batched pre-sync probe: the client sends a project-wide
content hash for each eligible project in one request, and the server
returns which ones still match so the client can skip syncing them.
- base: ProjectContentHasher (entity hashes + project-data hash, computed
identically on client and server) and probe request/response DTOs
- server: POST /projects/{userId}/sync_probe, recomputing each project's
hash from stored state; skips projects with an in-flight sync session;
400 on a malformed body
- client: cache the hash in the project journal (written at FinalizeSync,
invalidated on any content mutation via one chokepoint); probe is
best-effort and degrades to a full sync on any failure
- backstop: never skip a project with pending entity or project-data work,
so a stale cache can't drop a change
Writing activity is excluded by design (per-device, conflict-free).
Tests: ProjectContentHasher, client/server probe units, and an e2e suite
covering client/server hash agreement, the session gate, auth, and 400s.
509 lines
24 KiB
Markdown
509 lines
24 KiB
Markdown
# Synchronization Protocol
|
|
|
|
This doc will try to give a breif (_as possible_) overview of the client/server synchronization
|
|
protocol Hammer
|
|
uses.
|
|
|
|
## Two levels of syncing
|
|
|
|
**Account Sync:** This synchronizes what projects the Account has, creating, deleting, or renaming
|
|
just the top level directories on the client
|
|
|
|
**Project Sync:** This synchronizes an individual project and all of it's Entities
|
|
|
|
---
|
|
|
|
## Account Sync Protocol
|
|
|
|
Before any project level syncing is done, we must first do an Account level sync.
|
|
|
|
This will handle creating, deleting, and renaming projects, to bring the client and server into
|
|
parity with each other.
|
|
Additionally, it will find or create a `projectId` for the client's local projects. These are the
|
|
key to being able to sync a local project with the server.
|
|
|
|
Any given user account may only have one sync in progress at a time. Attempting to start a sync when
|
|
one is already in progress will result in a failure to begin the sync.
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client as Client
|
|
participant Server as Server
|
|
|
|
rect rgb(1, 59, 15)
|
|
Client ->> Server: GET /projects/{userId}/begin_sync
|
|
activate Server
|
|
Note right of Client: bearer token
|
|
Server -->> Client: 200 OK (Sync Began)
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: syncId<br/>projects<br/>deletedProjects
|
|
alt Sync already in progress
|
|
Server -x Client: 400 Bad Request (sync ends here)
|
|
end
|
|
end
|
|
rect rgb(11, 0, 74)
|
|
loop Rename Projects
|
|
Client ->> Server: GET /api/projects/{userId}/rename
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: bearer token <br/> syncId <br/> projectId <br/> projectName
|
|
Server -->> Client: 200 OK (Rename successful)
|
|
deactivate Server
|
|
activate Client
|
|
alt Rename fails
|
|
Server -->> Client: 4XX Bad Request
|
|
end
|
|
end
|
|
end
|
|
|
|
rect rgb(74, 0, 9)
|
|
loop Delete Projects
|
|
Client ->> Server: GET /api/projects/{userId}/delete
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: bearer token <br/> syncId <br/> projectId
|
|
Server -->> Client: 200 OK (Delete successful)
|
|
deactivate Server
|
|
activate Client
|
|
alt Delete fails
|
|
Server -->> Client: 4XX Bad Request
|
|
end
|
|
end
|
|
end
|
|
|
|
rect rgb(49, 0, 74)
|
|
loop Create Projects
|
|
Client ->> Server: GET /api/projects/{userId}/{projectName}/create
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: bearer token <br/> syncId <br/> projectName
|
|
Server -->> Client: 200 OK (projectId)
|
|
deactivate Server
|
|
activate Client
|
|
alt Creation fails
|
|
Server -->> Client: 4XX Bad Request
|
|
end
|
|
end
|
|
end
|
|
|
|
rect rgb(0, 15, 6)
|
|
Client ->> Server: GET /api/projects/{userId}/end_sync
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: bearer token <br/> syncId
|
|
Server -x Client: 200 OK (Sync completed)
|
|
deactivate Server
|
|
end
|
|
|
|
```
|
|
|
|
---
|
|
|
|
## Pre-Sync Change Probe
|
|
|
|
Between Account Sync and Project Sync sits an optional optimization. Account Sync brings the *set* of projects into parity; the probe then asks, in a single batched request, *which* of those projects actually have content changes — so the client can skip the per-project sync for every project that has none.
|
|
|
|
This matters because a full project sync costs ~4 round-trips (`begin_sync`, `project_data`, `writing_activity`, `end_sync`) even when nothing has changed, paid once per project on every app open. The probe collapses that to one request for the whole account.
|
|
|
|
The probe keeps no required state of its own: a client or server that ignores it loses nothing but speed.
|
|
|
|
### The Project-Wide Hash
|
|
|
|
Each project gets a single **project-wide content hash** computed over the two data sources whose divergence is unacceptable:
|
|
|
|
- all of the project's **entities** (the same per-entity hashes already produced for `ClientEntityState`), and
|
|
- the **project-data blob** (author, theme, word-count goal — hashed via `ProjectDataHasher`).
|
|
|
|
The aggregate is order-independent of enumeration: sort the entity `{id, hash}` pairs by id, fold `id:hash` pairs plus the project-data hash through the same MurmurHash3 used elsewhere. The function lives in the `base` module (alongside `EntityHasher` / `ProjectDataHasher`) so the **client and server run byte-identical code**.
|
|
|
|
**Writing activity is deliberately excluded.** It is per-device, conflict-free, and the project's authoritative record is the *union* of every device's slot — so no single device ever holds the full set, and a symmetric content hash that included it would never match across devices. It is also explicitly auxiliary (its sync phase already swallows errors and retries next time), so a skipped opportunistic activity sync is consistent with the existing tolerance. The trade-off: a change that touches *only* another device's writing activity will not be detected by the probe, and is picked up on the next sync that runs for any other reason.
|
|
|
|
### Symmetric Comparison
|
|
|
|
The probe compares **the client's current hash against the server's current hash** — not "did the server change since I last synced." A local edit makes the client's hash differ; another device's push makes the server's hash differ; only when both currently agree is the project skipped. One comparison covers both directions, and the server recomputes its hash on demand from its stored state — no per-client bookkeeping, in keeping with the protocol's "no required book keeping data" principle.
|
|
|
|
### Network Protocol
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Note over Client,Server: After Account Sync, before any Project Sync
|
|
|
|
Client->>Server: POST /api/projects/{userId}/sync_probe
|
|
activate Server
|
|
Note right of Client: ProjectsSyncProbeRequest<br/>[ { projectId, hash } ]
|
|
Note over Server: For each project, recompute the<br/>project-wide hash and compare
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: ProjectsSyncProbeResponse<br/>{ unchangedProjects }
|
|
|
|
Note right of Client: Skip unchangedProjects;<br/>sync everything else as normal.
|
|
deactivate Client
|
|
```
|
|
|
|
- `POST /api/projects/{userId}/sync_probe` — read-only, no `syncId` required.
|
|
- Request `ProjectsSyncProbeRequest { projects: List<ProjectHashItem> }`, where `ProjectHashItem { projectId, hash }`.
|
|
- Response `ProjectsSyncProbeResponse { unchangedProjects: Set<ProjectId> }`.
|
|
|
|
The server returns a project in `unchangedProjects` **only** when it is certain it is in sync — the project exists and its freshly recomputed hash matches. It omits anything it cannot certify, including any project with an **in-flight sync session** (whose stored hashes may be mid-update). A project the client never sends, or the server never returns, is simply synced the normal way.
|
|
|
|
If the endpoint is unsupported (older server) or the request fails for any reason, the client silently falls back to a full per-project sync — no behavior change.
|
|
|
|
### Correctness
|
|
|
|
The risk is asymmetric:
|
|
|
|
- A **false mismatch** — the hashes differ but nothing needed syncing — is harmless: just a redundant full sync.
|
|
- A **false match** — skipping a project that was actually divergent — loses no data: skipping is a no-op on both sides, and the next sync still reconciles through the normal dirty/conflict machinery. The only cost is that the two stay divergent longer than they should.
|
|
|
|
So the one rule the client must uphold is: **never skip a project that has un-synced local changes.** As long as a local change is recorded before a project could be reported unchanged, the probe can only ever *defer* a sync, never hide one — it adds no divergence risk beyond what the existing change tracking already guards.
|
|
|
|
How the client decides a project is eligible — and how it caches its own project-wide hash to avoid re-hashing every entity on each open — is a client implementation detail, not part of the wire protocol.
|
|
|
|
---
|
|
|
|
## Project Sync Protocol
|
|
|
|
## Goal
|
|
|
|
The goal of this protocol is to synchronize the various `Entities` on the client to the server.
|
|
|
|
There is no file history as in a true version control system such as `git`. This is instead a simpler synchronization system, yet still smart enough to detect `conflicts`, and prevent edits on multiple devices from overwriting each other on accident.
|
|
|
|
As such, there is very little book keeping data, and none of it is actually required. When all actors are fully synchronized, they all contain the full set of data. Thus if the server were to die and lose all of its data, it wouldn't matter. Every client would contain everything necessary to
|
|
setup on a new server.
|
|
|
|
Further more, the protocol is fully fault tolerant. It may fail at any step along the way, and the state of the client and server will remain entirely valid, although not entirely synchronized.
|
|
|
|
## Network Protocol (overview)
|
|
|
|
This is largely a client driven synchronization process.
|
|
|
|
### SyncIDs
|
|
The client calls `begin_sync` to get a valid `syncID`. This `syncID` is provided to all subsequent calls, and is terminated with a call to `end_sync`.
|
|
|
|
There can be only one valid `syncID` per project at any given time. This prevents race conditions with two clients syncing the same project at the same time.
|
|
|
|
#### Reclaiming a session (same install only)
|
|
|
|
A stale session would otherwise lock a user out of their own project until it expires — for example when a prior sync's `end_sync` never reached the server (the client was cancelled mid-sync, lost auth, or dropped its connection). To avoid this, `begin_sync` may **reclaim** an existing project session, but only when the request comes from the **same install** that owns it.
|
|
|
|
The install is identified server-side from the authenticated bearer token (never a client-supplied value), so it cannot be spoofed. The rules are:
|
|
|
|
- **Same install** as the active session → the old session is terminated and a fresh `syncID` is issued. The previous `syncID` immediately becomes invalid.
|
|
- **Different install**, session still active → `400 Bad Request`; the original session keeps its claim, preserving the cross-device race protection above.
|
|
- **Expired session** (any install) → treated as gone and reclaimable by anyone.
|
|
|
|
The client also fires `end_sync` even when its sync is cancelled, so sessions are normally released cleanly; reclaim is the safety net for the cases where that request can't be delivered.
|
|
|
|
You may however have `syncID`s for multiple different projects simultaneously.
|
|
|
|
These are Project level `syncID`s. Account syncing use separate Account level `syncID`s. There may only be one valid Account level `syncID` at a time, and if there is a valid Account `syncID`, then no Project level `syncID`s are allowed to be created. The Account level sync must finish before any Project level syncs may begin.
|
|
|
|
### Entity Update Sequence
|
|
The server will inspect the provided ClientState, and then return a sequence of Entity IDs. Those and only those IDs should be synchronized by the client, and in that order.
|
|
|
|
### Remote Entity Deletion
|
|
The last step befor individual Entity synchronization can begin is having the Client notify the server of any locally deleted Entities.
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: POST /project/$userId/$projectName/begin_sync
|
|
activate Server
|
|
Note right of Client: ProjectID<br/>ClientState
|
|
|
|
Server -->> Client: 200 OK (Sync Began)
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: ProjectSynchronizationBegan
|
|
|
|
rect rgb(74, 0, 9)
|
|
loop Delete Entities
|
|
Client->>Server: GET /project/$userId/$projectName/delete_entity/$id
|
|
deactivate Client
|
|
activate Server
|
|
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: DeleteIdsResponse
|
|
end
|
|
end
|
|
|
|
rect rgb(11, 0, 74)
|
|
loop Transfer Entities
|
|
Note right of Client: See breakout section for details
|
|
Client ->> Server: [various]
|
|
Server ->> Client: [various]
|
|
end
|
|
end
|
|
|
|
Client->>Server: POST /project/$userId/$projectName/end_sync
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: ProjectID<br/>SyncId
|
|
Server -->> Client: 200 OK (Sync Terminated)
|
|
deactivate Server
|
|
activate Client
|
|
```
|
|
|
|
## Network Protocol (Entity Transfer)
|
|
The Client now attempts to sync each ID provided in the server in the `Entity Update Sequence` in the order provided.
|
|
|
|
It will now either upload or download each ID depending on what it infers from the combined Client and Server state that has been transferred so far.
|
|
|
|
### Download
|
|
The client has determined that it needs to download the Server's copy of an Entity. This is either because the client is simply missing the Entity, or it has determined that the server has a newer version and it wants to overwrite the local client copy with the server copy.
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: GET /project/$userId/$projectName/download_entity/$entityId
|
|
activate Server
|
|
|
|
Server -->> Client: 200 OK (Sync Began)
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: LoadEntityResponse
|
|
```
|
|
|
|
#### Stale Hash Detection and Self-Healing
|
|
|
|
During a download, the server compares its cached entity hash with a freshly computed hash. If they don't match (which
|
|
can occur due to schema evolution, such as adding new fields to entities), the server returns a 412 Precondition Failed
|
|
response with details about the mismatch.
|
|
|
|
The client handles this by force uploading its local copy to "heal" the server's stale cache. This self-healing protocol
|
|
ensures that schema changes don't cause persistent sync issues.
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: GET /project/$userId/$projectName/download_entity/$entityId
|
|
activate Server
|
|
Note over Server: Cached hash != Computed hash
|
|
|
|
Server -->> Client: 412 Precondition Failed
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: StaleHashResponse<br/>{cachedHash, computedHash}
|
|
|
|
Note right of Client: Client detects stale cache<br/>and initiates healing
|
|
Client->>Server: POST /project/$userId/$projectName/upload_entity/$entityId?force=true
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: Force upload to heal server cache
|
|
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: SaveEntityResponse<br/>Server cache now healed
|
|
```
|
|
|
|
This mechanism is transparent to the user and ensures data consistency across schema migrations without requiring manual
|
|
intervention or database migrations.
|
|
|
|
### Upload
|
|
The client has determined that it needs to upload the local Client copy of an Entity. This is either because the server is missing the entity, or the client has a dirty copy that needs to be synchronized.
|
|
|
|
#### No conflict
|
|
In the nominal case, the server will accept the incoming entity, and simply overwrite the Server's own copy with it. The server knows this is safe to do so because it compares the Server copy's hash, with the provided `original hash`. If they match, the Server knows that the Client was editing the same copy which the server will now replace.
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: POST /project/$userId/$projectName/upload_entity/$entityId
|
|
activate Server
|
|
Note right of Client: X-Entity-Hash = {original hash} <br /> ApiProjectEntity
|
|
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: SaveEntityResponse
|
|
```
|
|
|
|
#### Conflict detected
|
|
In the case where the Sever and Client's `original hash` do no match, there is a conflict.
|
|
|
|
The server infers from this that the client was editing a different version of the Entity than what the server now has. This is probably because a different client uploaded an independent edit of the Entity.
|
|
|
|
The server will respond with it's copy of the Entity and require the Client to resolve the conflict by resubmitting the upload with `force=true` set.
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: POST /project/$userId/$projectName/upload_entity/$entityId
|
|
activate Server
|
|
Note right of Client: X-Entity-Hash = {original hash} <br /> ApiProjectEntity
|
|
|
|
Server -->> Client: 409 Conflict
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: ApiProjectEntity
|
|
|
|
Note right of Client: {client now helps the user resolve the conflict}
|
|
Client->>Server: POST /project/$userId/$projectName/upload_entity/$entityId?force=true
|
|
deactivate Client
|
|
activate Server
|
|
Note right of Client: X-Entity-Hash = {original hash} <br /> ApiProjectEntity {resolved entity}
|
|
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
activate Client
|
|
Note left of Server: SaveEntityResponse
|
|
```
|
|
Note that the resolved `ApiProjectEntity` in the `force` request does not have to be exclusively the Client's or Server's copy, it can be a merging between the two that the client helped the user create.
|
|
|
|
## Project Data Sync (non-entity blob)
|
|
|
|
In addition to entity sync, each project has a single per-project blob holding user-authored settings (author name, theme colors, word-count goal). This blob is synced as its own phase, inserted into the pipeline immediately *before* entity transfer so the project's identity is settled before any entity churn.
|
|
|
|
The blob is a structured object — see `ProjectData` in the `base` module — but is treated as a single unit at the sync layer. Conflict detection is hash-based, mirroring entity sync: the client persists the `lastSyncedHash` it most recently agreed on with the server and replays it on the next upload.
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: GET /project/$userId/$projectName/project_data
|
|
activate Server
|
|
Server -->> Client: 200 ProjectDataDto OR 204 No Content
|
|
deactivate Server
|
|
|
|
alt Local clean since last sync, server changed
|
|
Note right of Client: Fast-forward — adopt server state, save lastSyncedHash
|
|
else Both sides changed
|
|
Client->>Server: POST /project_data
|
|
Note right of Client: { data, originalHash = lastSyncedHash }
|
|
activate Server
|
|
alt Hashes match
|
|
Server -->> Client: 200 ProjectDataDto
|
|
else Conflict
|
|
Server -->> Client: 409 ProjectDataConflictDto
|
|
Note right of Client: User resolves per-field
|
|
Client->>Server: POST /project_data
|
|
Note right of Client: { data = resolved, originalHash = serverHash }
|
|
Server -->> Client: 200 ProjectDataDto
|
|
end
|
|
deactivate Server
|
|
end
|
|
```
|
|
|
|
Unlike writing-activity sync (which swallows errors and continues), a non-conflict failure on the project-data phase fails the whole sync — the data is user-authored and silent loss is unacceptable.
|
|
|
|
## Writing Activity Sync (per-device slots)
|
|
|
|
After entity transfer, the client syncs **writing activity** — an auxiliary record of writing sessions used for stats and observability (words written, session start/end, sealed flag). Each device tracks its own sessions locally; the project's full activity is the union of every device's log, keyed by `deviceId`.
|
|
|
|
The model is intentionally conflict-free by construction: **only the owning device ever writes its own slot**. When the client pulls the server's view, it wholesale-overwrites its local copies of *foreign* device slots, and merges only its *own* slot before pushing it back. There is no hash-based conflict detection like entity sync or project_data — each device is the sole writer of its slot, so there is nothing to conflict on across devices.
|
|
|
|
For the device's own slot, `mergeOwnSlotSessions` (see [SessionMerge.kt](common/src/commonMain/kotlin/com/darkrockstudios/apps/hammer/common/data/writingactivity/SessionMerge.kt)) unions sessions by `startedAt`. On collision it keeps the higher `wordsWritten`, the later `endedAt`, and `sealed = local || remote` (sealing is one-way).
|
|
|
|
```mermaid
|
|
sequenceDiagram
|
|
participant Client
|
|
participant Server
|
|
|
|
Client->>Server: GET /api/project/$userId/$projectName/writing_activity
|
|
activate Server
|
|
Server -->> Client: 200 WritingActivityResponse
|
|
deactivate Server
|
|
Note left of Server: { deviceId → DeviceLog }
|
|
|
|
Note right of Client: Overwrite local copies of<br/>foreign device slots.<br/>Merge own slot with server's copy.
|
|
|
|
Client->>Server: POST /api/project/$userId/$projectName/writing_activity/$deviceId
|
|
activate Server
|
|
Note right of Client: DeviceLog (own slot, merged)
|
|
Server -->> Client: 200 OK
|
|
deactivate Server
|
|
```
|
|
|
|
Endpoints (both take `projectId` as a query parameter):
|
|
|
|
- `GET /api/project/{userId}/{projectName}/writing_activity` → `WritingActivityResponse` (`Map<deviceId, DeviceLog>`)
|
|
- `POST /api/project/{userId}/{projectName}/writing_activity/{deviceId}` body: `DeviceLog`
|
|
|
|
Data shapes (`WritingSession`, `DeviceLog`, `WritingActivityResponse`) live in [WritingSession.kt](base/src/commonMain/kotlin/com/darkrockstudios/apps/hammer/base/http/writingactivity/WritingSession.kt).
|
|
|
|
Both GET and POST failures are logged and swallowed: the writing-activity phase never fails the surrounding project sync. Activity data is auxiliary observability — a transient network or server error must not block the user's actual content from syncing. Local state is left untouched on a failed GET, so the next sync simply tries again.
|
|
|
|
## Client Operations Sequence
|
|
Beyond the network side of the Protocol, the Client is doing a bit of work to ensure data loss is not possible, and to work out what should be done with the minimal book keeping data it has.
|
|
|
|
```mermaid
|
|
flowchart TD
|
|
A[PrepareForSync] --> B[FetchLocalData]
|
|
B --> C[FetchServerData]
|
|
C --> D[CollateIds]
|
|
D --> E[Backup]
|
|
E --> F[IdConflictResolution]
|
|
F --> P[ProjectDataSync]
|
|
P --> G[EntityDelete]
|
|
G --> H[EntityTransfer]
|
|
H --> W[WritingActivitySync]
|
|
W --> I[FinalizeSync]
|
|
```
|
|
|
|
## Terminology
|
|
|
|
**Entity**
|
|
any individual block of data. Each entity is given a unique ID. Examples include:
|
|
|
|
- Scene
|
|
- Scene Draft
|
|
- Timeline Event
|
|
- Encyclopedia Entry
|
|
- Note
|
|
|
|
**Entity ID**
|
|
Every Entity is given an Entity ID, which is a unique, monotonically incrementing
|
|
integer, with the first valid ID being 1
|
|
|
|
**Sync ID**
|
|
This is a UUID generated by the server and passed back to the client identifying a
|
|
particular syncing session to a particular client. The server will only allow one syncing session per
|
|
account at a time to prevent race conditions.
|
|
|
|
**Entity Update Sequence**
|
|
A list of Entity IDs in a particular order determined by the server.
|
|
The client will update these IDs in the provided order. The server will leave out IDs of Entities
|
|
that do not need synchronization.
|
|
|
|
**Re-ID**
|
|
The process of taking a client side Entity and issuing it a new ID, changing any
|
|
references to that ID in the process.
|
|
|
|
**Conflicts**
|
|
The same file that has been edited in different ways on different devices, must allow the user to resolve the conflict in order to bring them back into sync with each other.
|
|
|
|
**Dirty Entity** When a client edits a local Entity, it adds the **Entity ID** to a "dirty list"
|
|
together with that Entity's **conflict baseline** — the hash the server last confirmed for it. At
|
|
sync time the client sends this baseline as the upload's `original hash`; if another client edited
|
|
the same Entity and synced first, the server's hash no longer matches the baseline and the conflict
|
|
is detected.
|
|
|
|
The baseline is the hash recorded the last time the client and server agreed on the Entity (on a
|
|
successful upload or download), **not** a hash re-derived from the current local content at edit
|
|
time. Re-deriving it is unsafe: an Entity's hash includes fields such as `lastEdited` that the
|
|
autosave can stamp independently of a real content change, so a freshly computed baseline can
|
|
disagree with the server even when nothing meaningful changed — forging a phantom conflict. This is
|
|
the same locked-baseline scheme `project_data` uses with its `lastSyncedHash`.
|
|
|
|
A baseline exists for every Entity the client and server have agreed on, set on each successful
|
|
transfer. If a baseline is absent the server cannot conflict-check and accepts the upload, so a
|
|
project whose sync data predates this scheme backfills a baseline for every in-sync Entity on its
|
|
first sync (the local hash, which equals the server's for an agreed Entity) before any upload relies
|
|