Commit graph

1 commit

Author SHA1 Message Date
Reuven
f091d45575 docs(adr): add governance improvements to ADR-090/091, create ADR-092, add implementation checklists
ADR-090 (Ultra-Low-Bit QAT):
- Changed status to "Accepted (Staged Implementation)"
- Added decision statement choosing LoRA-QAT as first path
- Added staged implementation phases (4 phases, explicit gates)
- Added validation plan defining "better" (MSE, spectral, cosine, outlier retention)
- Added reasoning preservation metrics (PPL, GSM8K, HumanEval, tool use, long context)
- Added system invariants (INV-1 through INV-8)
- Added acceptance gates (G1-G6) with rollback triggers
- Restructured success criteria into correctness/performance/quality/rollout

ADR-091 (INT8 CNN Quantization):
- Changed status to "Accepted"
- Added decision statement with acceptance benchmark
- Added system invariants (INV-1 through INV-8)
- Added operator coverage table (11 operators)
- Added graph rewrite passes section (4 passes)
- Added deployment policy matrix
- Added acceptance gates (7 gates) with rollback conditions

ADR-092 (MoE Memory-Aware Routing):
- Split from ADR-090 as routing affects scheduling/cache, not representation
- Added decision statement with acceptance benchmark (≥70% cache hit rate)
- Added system invariants (INV-1 through INV-6)
- Added acceptance gates (G1-G5) with rollback conditions
- Added domain analysis with bounded context

Implementation Checklists:
- ADR-090: 6 phases, ~28 files, 16 new + 12 extended
- ADR-091: 6 phases, acceptance gate verification commands

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-12 10:47:00 -04:00