openclaw/docs/ci/release-validation
Peter Steinberger f0280ee9c3 fix(e2e): size first-hop budgets from measured update times
Allow 1800s per first-hop container and 2100s per lane using measured
published/candidate hop durations with a slow-host margin. Give the
six-source release self-upgrade job 80 minutes for two resource-limited
waves and setup. Preserve phase timing and concise update-step evidence.

Keep updater behavior, live authority checks, source coverage, and runner
concurrency unchanged. OverlayFS runtime-copy and journal-read overhead
remain a separate product performance follow-up.

Validation: 211 focused tests passed locally with one worker (55.36s wall);
inner/outer budget assertions failed against the prior harness. Bash syntax,
formatting, lint, timing formatter smoke, and diff checks passed. Independent
Codex review found no actionable P0-P2 findings.
2026-09-28 13:22:12 -07:00
..
full-release-validation.md chore(release): retire the internal Tideclaw alpha release track (#160261) 2026-09-28 10:01:49 -07:00
install-smoke-and-docker-e2e.md fix(e2e): size first-hop budgets from measured update times 2026-09-28 13:22:12 -07:00
live-and-e2e-shards.md
package-acceptance.md chore(deps): refresh dependencies through September 19 cutoff (#159401) 2026-09-27 19:33:08 -07:00
plugin-prerelease.md