openclaw/docs/help/testing
Peter Steinberger 36baa2cd98
fix(test): preserve the first Vitest timeout
The project runner replaced timed-out configurations with another attempt
and could turn their failed hooks into a green job. CI run 35928401414,
job 107409413294, masked seven settlement-hook failures this way.

Remove replacement dispatch and its expanded retry deadline. Keep the first
watchdog failure even when a child exits zero, retain incomplete reports,
and preserve process/cache cleanup.

Proof: the temporary fail-first test failed the real CI shard entry point
with exit 143 and one attempt. The runner owner passed 20 standalone runs
and three CI-config replays on Testbox; shared-helper importers passed.
2026-09-23 18:27:19 -07:00
..
contracts.md
docker.md refactor: retire pre-June import and verification compatibility (#156285) 2026-09-23 02:22:22 -07:00
live-workflows.md improve: profile concurrent Gateway sessions with live OpenAI (#154845) 2026-09-21 13:33:16 +00:00
qa-runners.md fix(qa): bootstrap isolated fixtures beside an installed Gateway (#153659) 2026-09-20 11:55:45 -07:00
suites.md fix(test): preserve the first Vitest timeout 2026-09-23 18:27:19 -07:00
writing-tests.md ci: defer maintainer tooling on product-only PRs (#153962) 2026-09-21 22:31:16 +00:00