Pulse/.github
rcourtman c728539f07 Restore completed Core E2E verdicts: shard CI, drop release tag from test image
Every main push since the v6 branch flip was cancelled at the 45-minute
job timeout with no verdict. The flip brought the full 94-spec suite onto
main (the last green run, 2026-06-29, ran only 2 specs on the v5 main),
and it runs sequentially against a release-tagged image whose mock-fixture
gate returns 403 without a demo entitlement. Dozens of specs fail, retry
twice each, and burn the budget: of the 31 minutes of suite time in run
28907574469, 18.8 minutes were failing attempts.

- Add GO_BUILD_TAGS build arg (default release) and build the pulse:test
  e2e image with it empty, matching the dev harness the suite is green
  under. Shipped images keep the release tag; release-gate behavior keeps
  its dedicated -tags release Go tests.
- Shard Playwright 4 ways across a CI matrix (214/202/205/203 tests per
  shard) with per-shard report artifacts and an aggregate verdict job.
- Cap CI at 20 failures so an env-broken run reports red in minutes
  instead of grinding into a no-verdict cancellation.
2026-07-08 08:00:55 +01:00
..
ISSUE_TEMPLATE Own prerelease feedback intake under deployment-installability 2026-04-16 15:18:46 +01:00
scripts Stop posting retest boilerplate on maintainer issue reopens 2026-06-11 15:10:33 +01:00
workflows Restore completed Core E2E verdicts: shard CI, drop release tag from test image 2026-07-08 08:00:55 +01:00
FUNDING.yml chore: add Ko-fi to funding options 2025-12-25 20:23:00 +00:00
PULL_REQUEST_TEMPLATE.md Port issue-first contribution policy to v6 docs 2026-05-01 20:28:11 +01:00
v6_rc_feedback_hub.md Rename user-facing RC wording to prerelease 2026-03-25 10:35:00 +00:00