Pulse/tests
rcourtman 725837dc39 test(e2e): quarantine the 50 spec files rotted against the platform-first UI
Core E2E has failed on every push since 2026-06-29. Fifty of the 81 spec
files still assert the pre-platform-first IA (locators, URLs, subheader
copy the June rebuild replaced), and with maxFailures aborting shards at
20 the healthy specs produced no verdict at all. The quarantine list in
playwright.config.ts excludes the rotted files from all three projects so
the remaining 38 files (323 tests, including the smoke and journey
coverage) return to being a live per-push gate.

This is a stopgap, named as such in the config comment. Each quarantined
spec leaves the list by being re-pinned to the current UI, never by
deletion; the recovery effort is tracked separately.

Contract-Neutral: E2E spec quarantine is test selection only; no deployment contract delta, and the contract file is another agent's in-progress work
2026-07-17 14:43:22 +01:00
..
integration test(e2e): quarantine the 50 spec files rotted against the platform-first UI 2026-07-17 14:43:22 +01:00
migration Stabilize v5 license migration fixtures 2026-07-17 01:02:05 +01:00
qualification/patrol Align restart-loop qualification with Patrol threshold 2026-07-16 20:53:02 +01:00