mirror of
https://github.com/diegosouzapw/OmniRoute.git
synced 2026-07-09 17:28:51 +00:00
fix(ci): give the heavy E2E shard headroom + stream live progress (#3392)
The 35m bump still wasn't enough — shard 5/6 (responsive viewport matrix + studio/smoke, ~24 serial tests after a ~5m build) was still cancelled at 35m, and the `github` Playwright reporter buffers output so the cancelled log showed no per-test results (couldn't tell which test was slow). - e2e timeout-minutes 35 -> 50 (the shard observably needs >35m; other shards finish in ~7m so they're unaffected). - Playwright CI reporter github -> line so per-test progress + timing stream live to the job log, making any genuinely slow/hung test diagnosable.
This commit is contained in:
parent
b4437dcee4
commit
a471d70c3c
2 changed files with 11 additions and 6 deletions
11
.github/workflows/ci.yml
vendored
11
.github/workflows/ci.yml
vendored
|
|
@ -500,11 +500,12 @@ jobs:
|
|||
test-e2e:
|
||||
name: E2E Tests (${{ matrix.shard }}/6)
|
||||
runs-on: ubuntu-latest
|
||||
# 20m was too tight for the heaviest shard: each shard re-runs `npm run build`
|
||||
# (~5m) before Playwright, so a slow shard's tests + build overran 20m and the
|
||||
# job was cancelled mid-run. 35m gives headroom; the per-test cap in
|
||||
# playwright.config.ts bounds any genuine hang to a fast, visible failure.
|
||||
timeout-minutes: 35
|
||||
# The heaviest shard (responsive viewport matrix + studio/smoke) re-runs
|
||||
# `npm run build` (~5m) then ~24 serial tests; at 35m it was still cancelled
|
||||
# mid-run, so it genuinely needs more wall-clock. 50m gives ample headroom
|
||||
# while the per-test cap (playwright.config.ts) bounds any real hang to a fast
|
||||
# visible failure and the `line` reporter streams which test is slow.
|
||||
timeout-minutes: 50
|
||||
needs: build
|
||||
strategy:
|
||||
fail-fast: false
|
||||
|
|
|
|||
|
|
@ -33,7 +33,11 @@ export default defineConfig({
|
|||
forbidOnly: !!process.env.CI,
|
||||
retries: process.env.CI ? 2 : 0,
|
||||
workers: 1,
|
||||
reporter: process.env.CI ? "github" : "html",
|
||||
// `line` (not `github`) in CI so per-test progress + timing stream live to the
|
||||
// job log. The `github` reporter buffers all output until the run ends, so when
|
||||
// a slow shard was cancelled at its timeout the log showed only "Running N
|
||||
// tests" then silence — impossible to tell which test was slow/hung.
|
||||
reporter: process.env.CI ? "line" : "html",
|
||||
expect: {
|
||||
timeout: process.env.CI ? 30_000 : 10_000,
|
||||
},
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue